Damaged Channel on Jalan Gili Sampeng VI Being Repaired
access_time February 03 2022 06:33 PM remove_red_eye 856
Reported by TP Moan Simanjuntak | Translated by Nugroho Adibrata
Reported by TP Moan Simanjuntak | Translated by Nugroho Adibrata
The West Jakarta Water Resources (SDA) Sub-agency is repairing the 70-meter-long water channel on Jalan Gili Sampeng VI, RT 10/03, Kebon Jeruk.
The repair is carried out by widening the channel from 40 centimeters to 60 centimeters
Kebon Jeruk Sub-district SDA Task Force Coordinator, Amir said, apart from being damaged, the channel was too small with an initial width of 40 centimeters.
"The repair is carried out by widening the channel from 40 centimeters to 60 centimeters," he expressed, Thursday (2/3).
Pothole on Senen Flyover RepairedHe explained it has been ongoing since January 7 by involving eight workers.
"It has touched 50 percent and
is targeted to be completed by the end of this month," he stated.